ROI calculator
Put a number on operational drag.
Use your workforce assumptions to estimate the hours, labor cost and productive capacity trapped in manual field administration and preventable rework.

Model your operation
Change the assumptions to match a real crew. The estimate updates instantly.
Your capacity case
Illustrative estimate based on 22 workdays and 65% utilization of recovered capacity.
This is a planning estimate, not a guarantee. It separates administrative labor savings from potential contribution generated by recovered capacity. Subscription and implementation pricing are intentionally scoped during discovery rather than assumed here.
Build the business case together ↗From estimate to evidence
Build the case with real operating inputs. Then report the result from the work.
Bring actual headcount, loaded labor cost, billable value and time lost. CrewMultiplier connects the improvement plan to workforce, attendance, readiness, logistics and production records, then turns that operating history into reconciled screen, CSV and PDF reports.
- Separate direct labor savings from additional productive capacity
- Track hours, exceptions, deployment and completed quantities together
- Filter by project, worker, shift, status and local date range
- Give operations and leadership a common, auditable record
Your next site should run differently
More work completed. Less operational drag.
Bring the operating problem that costs you the most. We will show how CrewMultiplier connects the decisions needed to resolve it.
Build my field operations plan ↗